# Portfolio

Every project on one timeline, in swimlanes by client or department, with milestones, active sprints and what is running late.

![Portfolio](https://projectri.com/docs-shots/workspace-portfolio.png)

## What it is

Portfolio is a roadmap across every project at once. Each project is a bar
positioned by the work inside it, grouped into swimlanes, with milestones as
diamonds and the current sprint as a thin rail underneath. It answers the
question no single project page can — what is running at the same time, and
which of it is late.

## How to get there

Portfolio is in the main navigation, gated on `report.view`.

Budgets appear only for a reader who holds `report.financial`. Where that key is
missing the fields never leave the server, so an absent budget on a row means
either "not permitted" or "never set" and both read the same way — as nothing.

There is no plan gate on this screen.

## How to use it

### Read the roadmap

1. Rows are sorted by start date, undated projects last. A roadmap reads left to
   right and a project with no dates has no position on one.
2. The roadmap opens at today rather than at the left edge — today sits about a
   third of the way in, so the recent past stays visible. The vertical accent
   line is today.
3. A bar's fill is how far through the project is, by completed tasks. The
   percentage is written inside the bar where there is room.
4. A warning triangle on a bar means the project has overdue work. **Late** means
   work is overdue, not that a planned end date has passed — a project can be
   past its end with everything finished.
5. Diamonds are milestones. Filled red is overdue, green is completed, hollow is
   still ahead. A milestone can sit outside the project's bar; a target date with
   no work against it yet is exactly the thing worth seeing on a roadmap.
6. The thin accent rail under a bar is the project's active sprint.

### Change the shape

1. **By client / By department** switches the swimlanes.
2. **Q / Y / All** zoom the axis. Three steps rather than a slider, because the
   useful questions are this quarter, this year and everything.
3. Click a swimlane header to collapse it.
4. **Refresh** re-reads the whole roadmap.

### Open a project

Click any row, in the gutter or on the timeline, to go to that project.

## What it affects

- **Nothing.** Portfolio is read-only. It is deliberately not a Gantt — there
  are no dependencies between projects in the model, so arrows would be
  decoration, and the interaction here is "click through to the project", not
  "drag the bar".
- **A project's span is derived, not stored.** There is no start date on a
  project. The bar runs from the earliest start or due date of the work inside
  it to the latest due date, so adding or re-dating a task moves the bar.
- **A project's department is its people's.** A project has no department of its
  own, so grouping by department uses the lead's department, and failing that the
  one most of its members report into. Ties break on the name so lanes are stable
  between loads.

## On mobile

The Expo app has **Portfolio** as a list rather than a chart — one card per
project, ordered by start, with the span written out instead of drawn. A
timeline wide enough to be readable does not fit a phone, and a squeezed one
turns every project into the same short smudge. The questions that survive the
change of shape are the ones a phone is used for: what is running, what is late,
what is next.

## Limits and gotchas

- A project whose tasks carry no dates at all cannot be drawn. It still gets a
  row and the words *no dates*, and the count of them is stated in a footer —
  a roadmap that quietly omits a third of the portfolio is worse than one that
  admits it.
- If **every** project is undated the page says nothing is scheduled yet rather
  than drawing an empty chart with rows down the side.
- Archived projects are excluded, and at most 200 projects are read.
- Projects with no client or no department are gathered into a named bucket
  rather than dropped, because a portfolio where half the work sits outside any
  client is itself worth seeing.
- Budgets are shown in the currency frozen on the project when the budget was
  set; the workspace's reporting currency only stands in where the budget never
  named one.

## Related

- [Projects](/docs/workspace/projects) — where a row leads, and where the dates come from.
- [Reports](/docs/workspace/reports) — the delivery overview this roadmap sits beside.
- [Capacity](/docs/workspace/capacity) — whether the people exist to run all of this at once.

## Related

- [Projects](https://projectri.com/docs/workspace/projects.md): The project list and the project itself — its people, milestones and progress, its tasks as a table, board, timeline or roadmap, and its documents, boards and meetings.
- [Reports](https://projectri.com/docs/workspace/reports.md): The fixed report page — completion, throughput, burndown, team performance and the effort figures, for this week, this sprint, this month or all time.
- [Capacity](https://projectri.com/docs/workspace/capacity.md): Committed hours against contracted hours week by week, built from the estimates on dated tasks, so an overloaded week is visible before it arrives.