# Status reports

Generated client status reports — a review queue across every project, the draft, the edit, and the send that publishes it to the portal.

![Status reports](https://projectri.com/docs-shots/workspace-reports-status.png)

## What it is

A status report is the period write-up a client receives — what was completed,
what is planned, where the milestones are, what the risks are and what is needed
from them. Projectri assembles the figures from the project itself and writes
the sentences around them, and you review and send. The page is a queue across
every project rather than a tab inside one, because the person this exists for
has twelve of these to read on a Friday afternoon.

## How to get there

**Status reports** sits under Reports in the main navigation and needs
`report.view` for the row. Reading the queue and opening a report needs
`project.view`. Generating, editing a paragraph, sending, skipping a period and
changing a project's settings all need `project.update` — generating calls a
model and costs money, and sending is the moment a document leaves the building
with your firm's name on it, so neither is something a read-only role can do.

Two query parameters open the screen at a specific place: `?report=` opens one
draft, and `?project=` selects a project. Those are the links notifications use.

## How to use it

### Work the review queue

1. The left rail lists every report **awaiting review** across all projects —
   drafts and reviewed reports, newest period first, up to a hundred.
2. Click one to open it in place. The subtitle at the top of the page counts
   what is waiting.
3. The queue loads immediately; a report's full contents are fetched only when
   you open it.

### Generate a draft

1. Choose a project in the picker below the queue. Its history appears under it.
2. Press **Generate for client**, or **Internal copy** for the version that
   carries hours and is never sent to a client.
3. If the generator wrote a paragraph containing a number the project data
   cannot account for, that paragraph is discarded and replaced with a plain
   sentence built from the figures — and the screen tells you how many were
   replaced. That is the difference between a plainer report and a silently
   degraded one.
4. **Regenerate** on an open draft rebuilds it for the same audience.

### Read and edit it

1. The facts strip at the top shows **Work complete**, **Milestones complete**,
   **Completed this period**, **Planned next period**, **Overdue**, **Blocked**
   and, where the section is on, **Budget used**.
2. **Since the last report** lists what changed, tagged as a risk, an issue,
   overdue, blocked, slipped, a sign-off, a milestone added or completed, a date
   moved or a new risk.
3. Each section can be edited in place. An edited paragraph is marked
   **Edited**, and **Restore generated** puts the original back.
4. Editing changes the prose only. The figures come from the project, not from
   the box — a number you type into a paragraph is not checked against anything.

### Send it

1. Press **Send now** and confirm.
2. The report becomes visible in the client portal and every client contact on
   the project is notified. There is no un-send.
3. Where the project keeps a stakeholder register, the contacts marked Informed
   on it decide the audience. Where there is none, every contact with a grant on
   the project receives it.
4. If a contact is marked Informed but has no access to the project, the screen
   says how many — silently omitting them would leave somebody believing they
   are on the distribution when they are not.
5. Internal stakeholders named on the register are notified separately that the
   report went out.

### Skip a period

Press **Skip** and give a reason. No report goes out, and the reason is kept, so
that later it reads as a decision rather than as a failed job.

### Download it

**PDF** renders the report as a document on demand, so it always matches the
prose currently on screen rather than a copy stored at generation time.

### Change how a project reports

Press **Settings** with a project selected.

- **Generate automatically** prepares a draft on the cadence below. Nothing is
  sent unless you send it.
- **Cadence** — Weekly, Every two weeks or Monthly.
- **Send day**, **Send time** and **Timezone**. The timezone is the client's,
  not yours.
- **Draft ahead by** — hours between the draft being prepared and the send
  window, so there is time to read it. The default is 24 and it can be set from
  0 to 168.
- **Send without review** is off by default. The first report that goes out with
  a wrong number costs more than this saves.
- **Tone** — Professional, Concise or Detailed.
- **Sections** — Summary, Milestones, Completed this period, Planned next
  period, Risks and blockers, Budget, and Needed from you. The set is fixed so
  that twelve reports read the same way; switch off what a particular client
  should not see. **Budget is off by default**, because burn against a budget a
  fixed-price client never agreed to reads as an overrun they are about to be
  billed for.

## What it affects

- **Sending publishes to the client portal.** The report appears at the client's
  project and every notified contact gets a link straight to it.
- **A sent report is frozen.** It cannot be edited afterwards; generate the next
  period instead.
- **The stakeholder register narrows the audience.** A RACI describing who
  should be told, next to a mailer that tells everybody, is two sources of truth
  and the document is the one that loses.
- **A cron does two things on the same pass** — it generates the draft the
  configured number of hours before the send window, and it sends at the window
  only for projects with **Send without review** on. Everything else sits in
  the queue.
- **A status report is schedulable.** In
  [scheduled delivery](/docs/workspace/reports-schedules), Status report is one
  of the four things you can send, and the subject is the project.
- **The figures come from the project.** Milestones, task completion, overdue
  and blocked work, budget burn and the client timeline are read at generation
  time, so a report is a snapshot of the project as it stood then.

## On mobile

**Status reports** in the app is built for the Friday-afternoon review away from
a desk. It reads the queue, opens a report, and lets you edit a paragraph, send
and skip. It does not compose the configuration and it does not generate — a
cadence, a timezone and seven section toggles are desk work, and generating
calls a model and costs money, which is too easy to trigger from a list row by
accident.

## Limits and gotchas

> [!WARNING]
> Sending is final. The report becomes visible in the client portal and the
> contacts are notified immediately. There is no un-send.

- **Numbers come from the data, sentences from the model, and never the other
  way round.** Every numeral in generated prose is checked against the figures
  before it is stored; one that cannot be accounted for takes its whole
  paragraph out and replaces it with a deterministic sentence.
- **An internal copy is never sent to a client.** Trying to send one is refused;
  it carries hours and exists for your own file.
- **A report that has been sent or skipped cannot be sent again**, and a project
  with no client cannot send at all.
- **Every section switched off leaves nothing to show**, and the screen says so
  rather than rendering an empty document.
- **The history list shows the last 50 reports** for the selected project.

## Related

- [Reports](/docs/workspace/reports) — the internal figures behind the write-up.
- [Scheduled delivery](/docs/workspace/reports-schedules) — sending a project's report on a cadence.
- [A report in the portal](/docs/portal/project-report) — what the client actually sees.
- [Projects](/docs/workspace/projects) — where the milestones and budget being reported come from.

## Related

- [Reports](https://projectri.com/docs/workspace/reports.md): The fixed report page — completion, throughput, burndown, team performance and the effort figures, for this week, this sprint, this month or all time.
- [Scheduled delivery](https://projectri.com/docs/workspace/reports-schedules.md): Reports that arrive on their own — the cadence, the recipients, and whether the ones you thought were arriving still are.
- [A status report](https://projectri.com/docs/portal/project-report.md): One period's status report as your supplier sent it — what you are asked to do, what happened, what is planned — with a PDF download.
- [Projects](https://projectri.com/docs/workspace/projects.md): The project list and the project itself — its people, milestones and progress, its tasks as a table, board, timeline or roadmap, and its documents, boards and meetings.