# Utilization

Logged hours as a percentage of capacity, measured against the target for each person's role, with twelve periods of history behind every name.

![Utilization](https://projectri.com/docs-shots/workspace-utilization.png)

## What it is

Utilization is hours logged divided by capacity, over a period that has already
happened. Every row carries the target that applies to that person, so the
number can be read rather than argued about — 73% against a 75% target is a mild
miss, against a 60% target it is somebody working too hard.

## How to get there

Utilization is in the main navigation, gated on `report.utilization`.

Scope follows the key rather than a control. Without `report.utilization` the
route hands you your own row instead of refusing — the person who most needs to
know they are booked at 140% is the person booked at 140% — and the badge beside
the title says **Just you** or **Whole firm** so one row never reads as a broken
screen.

Two further keys add columns rather than rows. `report.financial` adds the
variance expressed in money; `report.cost` is the salary-adjacent key used
elsewhere in the reporting group. Where a reader does not hold them the column is
**absent**, never blank or zero — a zero would read as the firm having no rate
data.

There is no plan gate on this screen.

## How to use it

### Pick what is being measured

1. The four measures across the top decide what the numerator is, and the target
   is judged against whichever one is selected.
2. **Billable** is billable hours over capacity. **Client** adds non-billable
   client work. **Productive** adds internal strategic work — research,
   training, documentation. **Total** is all tracked hours.
3. **How this is calculated** prints those four definitions verbatim, plus how
   capacity is derived and the order in which a target is resolved.

### Change the period and the grouping

1. The period menu offers this week, this month, last month, this quarter, year
   to date and this year.
2. **Group by** rearranges the rows — by person, role, team, department, project
   or client. It is absent for a reader who may only see themselves, because a
   team-shaped row containing one person reads as "the team did six hours".

### Read a row

1. Rows are sorted by distance from target in either direction, so whatever is
   furthest off is at the top. Sorting by actual descending would put the
   burnout risks at the top under something that reads like a leaderboard.
2. The bar is the actual, drawn against a fixed 0–120% track so two rows can be
   compared by eye. The dark line across it is the target; the fainter red line
   is the upper bound.
3. Under and over are both amber — both are a miss. Only sustained over the
   upper bound goes red, because that is the only one of the four states that
   costs a person rather than a margin point.
4. A row whose target came from the published benchmark rather than from your
   own policy is labelled **benchmark default**, so a seeded 75% is never
   mistaken for a number somebody chose.

### Open one person's history

1. When the table is grouped by person, click a name.
2. Twelve periods open underneath, each drawn against the target that was in
   force at the time — targets are effective-dated exactly so a change on 1
   January does not rewrite December.
3. A period with no capacity is drawn as a dashed outline, not a zero column.
   Somebody on parental leave or hired in month seven has no denominator, and a
   zero-height bar would read as "did nothing".
4. The history is only offered on person rows. A role or a client aggregates
   people, and its twelve-month utilisation is a different report with a
   different denominator.

## What it affects

- **The confidence figure.** The compliance percentage from
  [Timesheets](/docs/workspace/timesheets) is printed in the totals strip. Where
  it is below 100% the screen says how many hours across how many people are
  unlogged, and states that every actual on the page is therefore a floor. Where
  nothing has been computed at all it shows a dash and a warning, not 100%.
- **The burnout strip.** People sustained over the upper bound for several weeks
  running are named above the table, with the number of consecutive weeks and
  the peak. It is answered per week rather than per period, which is why it is
  not a column.
- **The firm-wide row.** Its target is a capacity-weighted blend of the role
  targets and is labelled as one. It moves when you hire, not when policy
  changes. No single firm-wide target is ever presented as policy.
- **Assumptions.** Anything withheld is stated at the foot of the table rather
  than silently dropped, so a reader knows the margin is restricted rather than
  unknown.

## On mobile

The Expo app has **Utilization** with the same rules — the same four measures,
the same amber-for-both-directions colouring, and the same blend label on the
firm-wide row. It is read-only there; setting a target is effective-dated policy
that moves everybody's variance at once, and that form stays where the whole
table is visible.

## Limits and gotchas

- Capacity is contracted hours less public holidays and approved leave, so a
  week off does not read as a week idle. That divides by the workspace's
  **working days**, which are provisioned from the country the workspace was
  created with. A Gulf tenant left on a Monday–Friday week has a wrong
  denominator on every row here.
- Utilization is **backward**, over time entries.
  [Bench](/docs/workspace/bench) is forward, over bookings. They are different
  measures of the same firm and conflating them is the commonest mistake made
  with both.
- A target resolves person first, then role and team, then role, then team, then
  the workspace fallback, and the published benchmark applies only where nothing
  is configured. Targets are set under **Admin → Finance → Targets**.
- Changing the measure clears the open history charts rather than relabelling
  them, so a chart under a row can never be drawn on a different measure from
  the row itself.

## Related

- [Timesheets](/docs/workspace/timesheets) — the compliance figure that qualifies every number here.
- [Bench](/docs/workspace/bench) — the same firm measured forward instead of back.
- [Capacity](/docs/workspace/capacity) — committed hours by week, from task estimates.

## Related

- [Timesheets](https://projectri.com/docs/workspace/timesheets.md): Who has filled their timesheet in for this period and who has not, plus the queue where submitted time is released for billing.
- [Bench](https://projectri.com/docs/workspace/bench.md): How much billable capacity is unbooked over the coming weeks, what it is costing, and which people are free.
- [Capacity](https://projectri.com/docs/workspace/capacity.md): Committed hours against contracted hours week by week, built from the estimates on dated tasks, so an overloaded week is visible before it arrives.
- [How permissions work](https://projectri.com/docs/features/permissions-model.md): The three tiers Projectri decides "may this person do this" with, how a role default becomes one person's answer, and the two traps that catch every new key.